Design Development for the Curtin University B311 FlexiLab project recommences this week. The laboratory, preparation and student arrival area will be accommodated in a new building with an enclosed link to an existing two-level laboratory constructed in the mid-1970s (pictured). The existing building will be extensively modified to provide better administration, staff facilities, research laboratories, and storage for equipment, consumables, chemicals, and dangerous goods.
Comment
This post doesn't have any comment. Be the first one!